Gate,Required evidence,Who decides,Hold or stop condition,Your entry / measured result,Evidence or drawing reference,Owner / status 1. Freeze the trial scope,"Tray revision, line, load arrangement, cycle and comparison baseline",Engineering and process owner,Unresolved design or acceptance requirement,,, 2. Receive the component,"Identity, agreed material documents and dimensional results",Receiving quality,Missing identity or unapproved deviation,,, 3. Check cold assembly,"Seating, envelope and actual mating components",Engineering and maintenance,"Unexpected interference, rocking or incomplete seating",,, 4. Verify authorised transfer,"Approved route, support changes and observed contacts",Equipment owner,"Unexpected contact, instability or motion outside agreed conditions",,, 5. Authorise thermal trial,"Process plan, instrumentation and segregation of trial output",Process owner,No approved method for evaluating the changed load,,, 6. Inspect after the cycle,Comparable dimensional readings and condition photographs,Quality and engineering,Change outside the agreed acceptance criteria,,, 7. Disposition trial products,Required product tests and traceable batch results,Product quality authority,Results missing or outside product requirements,,, 8. Release a defined scope,"Signed decision, restrictions and follow-up inspection point",Named release authority,Unclosed deviations or unspecified operating scope,,,