Boundary,Items to allocate,Required interface evidence,Suggested responsibility to resolve,Your entry / measured result,Evidence or drawing reference,Owner / status Tube body and joints,"Tube body, returns, end closure and any specified joints","Drawing revision, material/product form, heated length and required inspection",Tube supplier + responsible design reviewer,,, Mounting flange,"Integral/welded flange, adapter, fasteners and seal as individually listed","Mating drawing, bolt pattern, orientation, face requirement and sealing detail",Tube supplier and furnace owner,,, Supports,"New/reused brackets, hangers, saddles or end supports","Location, contact geometry, movement allowance and retained-part condition",Furnace OEM or designated engineer,,, Internal components,"Flame guide, inner tube, spacers or recuperator where applicable","Burner model, OEM part identifiers and arrangement",Burner OEM / nominated supplier,,, Burner and services,"Burner, gas/air train, ignition, monitoring and controls: included or excluded","Interface drawing, utility requirements and approved control scope",Burner supplier / system integrator,,, Furnace penetration,"Sleeve, insulation, refractory repair and sealing work","Wall section, access and installation instructions",Plant or installation contractor,,, Inspection boundaries,"Tube inspection, assembly fit-up, installed connections and operating checks","Method, acceptance criteria, report, witness and responsible party for each",Named inspection owner for every stage,,, Delivery and release,"Loose/assembled supply, packaging, installation and commissioning","Packing list, handling instructions, site access and sign-off record","Supplier, installer and commissioning owner",,,