How ECOOSUN Reviews Drawings, Samples and Operating Conditions Before Quotation
Direct answer: Before quotation, ECOOSUN reviews the customer drawing or used sample together with the component’s furnace position, critical interfaces, load or workpiece arrangement, operating atmosphere, thermal cycle, failure evidence and inspection requirements. The purpose is to separate confirmed requirements from assumptions and identify the information that controls the casting
How ECOOSUN Reviews Drawings, Samples and Operating Conditions Before Quotation Keep Reading »