Direct answer
Control a replacement furnace-part drawing by identifying the current revision, effective date, approved changes, installed condition, and relationship to the worn sample. Before quoting, confirm that the supplier and buyer are using the same reference. Compare changed interfaces, supports, openings, shafts, connections, and critical dimensions with the part actually in service. Revision control prevents a technically correct part from being made to an obsolete or incomplete design.

What to record on the revision sheet
Include drawing number, revision, date, change description, approval status, part position, and the source file used for the RFQ. If the sample differs from the drawing, list the difference rather than silently selecting one. Mark dimensions that are critical to fit, load, locating, connection, or handling.
Compare the drawing with the installed part
Photograph the part installed and removed. Check the current support, rail, bearing, drive, burner, connection, or lifting interfaces. A drawing can be correct while the furnace has been modified. The replacement decision should state whether it follows the approved drawing, the current installation, or a revised design.
Close the handoff loop
Send the approved reference and open questions to the supplier. Ask for a quotation that repeats the drawing revision and assumptions. Before production, approve the final drawing or marked-up sample. Keep the inspection report tied to the same revision.

How ECOOSUN can help
ECOOSUN can review drawings, worn samples, operating information, engineering requirements, and inspection requirements for custom heat-resistant cast parts. Begin at Heat Treatment Fixtures or use contact-us.
FAQ
Which drawing revision should govern a replacement furnace-part order?
The order should identify one approved revision and the corresponding acceptance requirements. Resolve differences between old drawings, installed parts and new measurements before manufacturing starts.
How should a supplier record an approved design deviation?
Identify the affected feature, reason for the change and approval reference, then carry the agreed change into the controlled drawing or order record. Avoid relying on an untracked note or an earlier email alone.
Manufacturing and Product Evidence

For a project review, send your drawing, sample photos, furnace conditions, quantity and inspection requirements through our Contact Us page.
Related Quality and Procurement Evidence
Use these guides to define inspection, documentation, traceability and release requirements for custom heat-resistant furnace castings:
- First Article Inspection for Custom Heat-Resistant Steel Castings
- Material Certificates and Quality Documents for Heat-Resistant Castings
- How to Read a Heat-Resistant Casting Inspection Report
- Heat and Batch Traceability for Custom Heat-Resistant Castings
- Inspection and Test Plan for Custom Furnace Castings
- Witness Points and Hold Points for International Furnace-Part Orders
- Nonconformance, Rework and Corrective Action for Custom Castings
Product families where this guidance may apply
Manufacturing and quality evidence · Official company facts and current catalog
Information for a Faster Quotation
Provide the drawing revision, material standard, critical dimensions and tolerances, required inspection and NDT scope, traceability documents, report format, witness or hold points, and final release requirements.
Request a Custom Quote · Send Your Drawing · WhatsApp ECOOSUN