Direct answer
Before replacing a heat treatment basket, preserve its condition and record the installation context. Photograph all sides, mark the lifting and furnace directions, measure stable reference features, and map deformation, wear, cracks, and contact marks. Then compare the sample with the current drawing or an earlier record. The aim is to identify the intended design and the service damage separately, so the replacement does not reproduce a distorted or incorrectly supported basket.

Preserve the evidence first
Do not cut, straighten, weld, or aggressively clean the basket before taking photographs and notes. Photograph it installed if safe, then photograph the empty part from top, bottom, side, and lifting directions. Place a scale or known dimension in the frame where possible. Mark the drive or operator side, the furnace entry direction, and the location of each defect.
Measure from meaningful references
Measure the overall envelope, supports, lifting features, key openings, and contact points. Identify which measurements are taken from undamaged areas. If the basket is warped, record the direction and maximum deviation rather than treating the warped outline as nominal. A sketch with datums and arrows is often the fastest way to explain the condition.
Record how the basket was used
Add the workpiece arrangement, approximate load, loading method, support locations, furnace position, and handling history. Note whether the basket was overloaded, stacked differently, or modified. These details are not a blame exercise; they help the supplier decide whether a direct replacement or a design review is appropriate.

Send a replacement package
Include the drawing or sample, photo map, measurements, failure history, furnace interface, load arrangement, and required inspection records. ECOOSUN can review this information for a custom basket through Heat Treatment Baskets or contact-us.

RFQ information checklist
For a useful first review, send the drawing or used sample, key dimensions, furnace type, load, operating cycle, visible failure evidence and any required inspection points. Final material and acceptance decisions are confirmed for the specific project.
Buyer decision point
| Input to confirm | Why it matters |
|---|---|
| Drawing or used sample | Defines the geometry and replacement reference. |
| Furnace interface and clearance | Confirms fit, handling and movement inside the furnace. |
| Load and operating cycle | Supports review of loading, thermal expansion and service conditions. |
| Failure record and inspection requirement | Connects the replacement scope to the observed problem and acceptance check. |
FAQ
What should a buyer confirm for a heat treatment basket requirement?
Confirm the drawing or used sample, key dimensions and interfaces, furnace type and clearance, load, operating cycle, failure evidence and inspection requirements. Final acceptance criteria should be agreed for the specific project.
Can ECOOSUN review a custom heat treatment basket requirement?
Yes. ECOOSUN can review a customer drawing or used sample and discuss casting, laboratory and inspection requirements for a custom furnace-component project. Suitability and final scope are confirmed from the supplied information.
Related Heat Treatment Basket Resources
Use these technical guides when specifying, inspecting or replacing heat treatment baskets for an industrial furnace:
- Heat Treatment Baskets: Load, Material and RFQ Guide
- How to Choose Heat Treatment Baskets
- Heat Treatment Basket Failure Analysis
- How to Replace a Heat Treatment Basket from a Worn Sample
Related ECOOSUN Products
Information for a Faster Quotation
Provide alloy grade or service conditions, basket dimensions, expected load, operating temperature, furnace type, quantity, drawing or used sample, and inspection requirements.
Request a Custom Quote · Send Your Drawing · WhatsApp ECOOSUN