A worn basket is a useful starting point for a replacement inquiry. Send the available sample information together with installation photographs, critical dimensions and operating conditions. The first decision is which features to reproduce, which dimensions remain uncertain and which changes require approval.
A request to “make the same basket” leaves that decision open. Procurement, maintenance and the supplier need one agreed replacement reference before production begins.
Separate measured condition from intended geometry
Casting accuracy concerns how closely dimensions approach the intended drawing values. Dimensional consistency concerns variation across production. The distinction matters when creating a replacement reference: a measurement of one used part does not, by itself, establish the nominal dimension or an acceptable production tolerance.[S1]
Mark each recorded dimension as confirmed, worn, distorted or unknown. Photograph a bowed wall or damaged stacking foot before any alteration. If several baskets remain available, compare corresponding locations and ask maintenance which surfaces actually locate the basket. Differences are questions to resolve, rather than dimensions to average automatically.

Build a replacement information sheet
| Information | What to provide |
|---|---|
| Identity | Existing part number, previous drawing and revision, if available. |
| Geometry | Outside dimensions, usable space, wall and base details, with units and measurement locations. |
| Interfaces | Stacking feet, mating recesses, support surfaces and handling locations. |
| Loading | Workpiece arrangement, batch weight and stacking configuration. |
| Service | Recorded temperature cycle, furnace atmosphere, cooling practice and observed damage. |
| Acceptance | Dimensions and inspection records needed before dispatch. |
Use a scale reference in close-up photographs, but provide actual measurements separately. A perspective photograph should help identify a feature; it should not be the only definition of a critical interface.
Decide whether this is reproduction or redesign
For a reproduction, identify the dimensions and features that must remain compatible with existing equipment. For a redesign, list the proposed changes separately: reinforcement, mesh, handling features or loading arrangement. Ask for the consequences of each change to be reviewed before combining it with the replacement order.
Heat-resistant steel selection involves both resistance to the furnace environment and mechanical behavior at temperature. An alloy name or a maximum-temperature figure alone does not define a basket’s suitability for its actual load and cycle.[S2]

Approve a drawing and a first-piece check
Pattern design accounts for the finished component dimensions, process allowances and casting contraction. The tooling drawing and finished-part drawing therefore serve different purposes. Approve the required finished basket geometry rather than treating a tooling dimension as a finished inspection value.[S5]
Before ordering, close the open dimensions, confirm the material requirement and agree the first-piece inspection. Where a sample has uncertain features, record who will approve the resolved dimensions. Keep any later trial feedback attached to the same drawing revision.
Need a replacement heat treatment basket? Send ECOOSUN photographs of the old basket, your available dimensions and the loading conditions. Mark the features you need to retain and the areas you would like reviewed.
Frequently asked questions
Can a supplier quote without receiving the physical basket?
Yes, a clear drawing or complete dimensioned photo package may be enough for an initial review. A physical sample is useful when hidden features, distortion or wear are difficult to measure.
Should a deformed basket be straightened before sending it?
Do not alter the sample before photographing and measuring it. The deformation may help the engineering team understand what happened during service.
Can the replacement be improved instead of copied?
Potentially, but any change should be based on the furnace interface, load path, failure evidence and buyer approval.
Related product information: Heat Treatment Baskets · Send drawings and requirements to ECOOSUN.
Technical references and scope
The references support the marked technical principles. The purchasing checklists and workflow are editorial applications. Historical references do not establish current standard editions, project-specific acceptance limits or ECOOSUN performance guarantees.
- S1. Foseco Ferrous Foundryman's Handbook; PDF pages 32, 33, printed pages 21, 22. Dimensional accuracy versus consistency; process control affects dimensional spread.
- S2. Foundry Handbook, Volume 2: Cast Steel (Chinese-language reference; title translated); PDF pages 188, 189, printed pages 171, 172. Heat resistance includes environmental/oxidation resistance and high-temperature mechanical behavior, including time-dependent behavior.
- S5. Foundry Tooling Design Handbook (Chinese-language reference; title translated); PDF pages 9, printed pages 7. Tooling selection considers production and technical requirements; pattern dimensions include process allowances and contraction.
Related Heat Treatment Basket Resources
Use these technical guides when specifying, inspecting or replacing heat treatment baskets for an industrial furnace:
- Heat Treatment Baskets: Load, Material and RFQ Guide
- How to Choose Heat Treatment Baskets
- Heat Treatment Basket Failure Analysis
- How to Inspect a Heat Treatment Basket Before Replacement
Related ECOOSUN Products
Manufacturing and quality evidence · Official company facts and current catalog
Information for a Faster Quotation
Provide alloy grade or service conditions, basket dimensions, expected load, operating temperature, furnace type, quantity, drawing or used sample, and inspection requirements.